New Siding and Window (not the door wall)
End of the House
Delivery of Dry Wall
Placement of front Window
Ted and Eric building the interior wall
So much has happened but have little time to update this.
-Back of the house is resided
-kitchen and our bedroom window replaced
-end of the house is completed
-lights by the garage door are installed
-drywall has been delivered
-front window is in place
-interior walls are being built and put in place

No comments:
Post a Comment